February 3rd – I was out unexpectedly early, so I left work while it was still light. The sharp wind was drying out the towpaths, so I hopped onto the canal at Aldridge to get a break from the traffic of the school run. 

Passing the drain sluice near the Big House at Clayhanger, I noticed something I hadn’t previously. I always thought that if the sluice were opened, it would drain the canal onto the gardens below, as early pictures show this sluice feeding an open channel.

Now the leaves are off the trees, I see there’s actually a drain shaft on the embankment through the trees a few yards away that it must flow into; one assumes this is connected to the common drain for the area.

I’d always wondered why that sluice wasn’t better locked than it is.

Unknown's avatar

Author: BrownhillsBob

I told the truth - but told it bent. Wandering around bemused and ranty since 2007.

Leave a comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.