April 16th – Spinning up to Screwfix in Walsall Wood, I noticed that the bank restoration works near the Black Cock Bridge were still ongoing. It seems that after the sectional piling was installed, earth has been spread to the level of it and dropped in front.
This work has primarily been to stabilise the bank and counter erosion, and is not to do with subsidence, as some have asserted. It is interesting to note at this point, that the fall from the embankment on that side is very steep, and the consequences of a breach on that side could be severe.
I do hope they get around to stabilising the brickwork on the other side, though, it’s falling away and is still hazardous to users.