March 31st – At Clayhanger Bridge on the canal near Brownhills, there’s a sluice that allows the waterway to be drained into local sewers if necessary. I noticed today that it had temporary fencing around it, and that micropiles – stainless steel rods inside sleeve tubes and packed out with expanding foam – had been fitted around the sluice and along the adjoining canal bank.
This is clearly a stabilisation job, and I’m intrigued as there’s not real outward sign of such a thing being necessary – except for the fact that I suspect the bank and culvert may be subject to destructive erosion if used, which these piles may relieve.
The tops currently stood proud will be chopped off at ground level later.
Meanwhile, closer to Catshill Junction, the embankment has been falling away into the canal for over a year, and nothing has been done despite drawing it to the attention of the Canal & River Trust.
Most peculiar.