December 20th – Spotted in Telford on a very brief visit at the new footbridge project, this will only be of interest to those into civil engineering.

The absolute worst sheet metal piling job I’ve ever seen. Not the varying depths – that can be normal, and they’d but cut level afterward; but the sheets are designed to go in true and interlock.

Were they piling guys on the pop?

Unknown's avatar

Author: BrownhillsBob

I told the truth - but told it bent. Wandering around bemused and ranty since 2007.

Leave a comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.