January 28th – The work on Ogley Junction Footbridge in Brownhills looks to be more than just a quick coat of paint. On the pontoon built a week ago, scaffold has now been built and looks set to encase the whole structure – possibly to screen it off fo shotblasting.
Crossing the bridge was still possible but tricky with a bike due to the bracing poles across the footpath, and I think this week the bridge will become impassible.
I do hope they create a decent diversion, but at the moment, I’m not optimistic about that, as none was in force when I passed through.
The work carried out on this ageing bridge – one of only three listed structures in Brownhills – will be fascinating to watch.


