March 1st – I took the chance to check out the Ogley Bridge renovation work, as I feel sure it must be close to reopening soon. As I suspected, if you approach the works from the Chasewater side it’s possible not only to enter the work canopy, but leave from the far end, with less hauling of the bike – just a bit of a throw and clamber around some sectional fence.
The scaffold cross-members that originally blocked the bridge deck have gone.
I note that the painting now seems to be over and that the deck has been surfaced with a nicely grippy texture, so as I suspected, reopening cannot be far off now, which will reopen the route for less adventurous cyclists and walkers.
This renovation has been much more thorough than I anticipated.