July 19th – Following the canal breach a few weeks ago, that saw the local canals lose nearly a foot in level following a breach into a culvert beneath the waterway at Little Bloxwich, the repair has been effected and levels are back up to a healthy level now.
At Clayhanger, the low end of the overflow is now running well and it’s a fine sight and sound once more.


