#365daysofbiking Risen again

December 25th – At Chasewater, I noticed how close to overtopping the weir the reservoir is again, despite the outflow valve to the spillway being open.

That’s a remarkable indication of the state of the recent weather: Naturally, more water is flowing in to the pool than is flowing out. And that’s a considerable amount.

You know what I want for Christmas? A dry spell.

This journal is moving home. Find out more by clicking here

from Tumblr https://ift.tt/2thp6CQ
via IFTTT

March 18th – I popped up to a wind-blasted Chasewater, which is still a mud-bath. I noted that the wakeboard lines are reopening for the season, and the canal valve is still open – but by no means fully; the spillway is now dry and the balancing culvert valve has been closed.

The canal filling could well be to do with works ongoing around the Midlands network right now; on recent rides I noticed a lot of drained locks and other works ready for the new season.

Either way, the level seems to have been roughly stable now for a month or so. I presume the earlier dam works have now finished.

It’ll be interesting to see how low the water gets over the coming summer.