April 21st – I came back through Walsall Wood as I had to make a call, and noted that the new leisure centre at Oak Park was nearing completion. Due to the size and location, it’s been really hard to get decent pictures of, but it looks like it’s going to be a great place and a worthy successor to the raging centre currently here.

I note huge amounts of earth are being moved around the site at the moment to regrade an re-landscape it.

I look forward to seeing the finished project.

March 30th – I stopped to take a look at the new pond at Clayhanger, which to my surprise, still looks very wintery. It was  far too wet to go down to the water or ride round, and from my vantage point I couldn’t see if the swans were nesting on the island this year.

There were signs of spring, however, in the track adjacent which was of course the line of the mineral railway that served Walsall Wood Colliery. The hedgerows and scrubs forming a woodland tunnel were looking fresh with a smattering of emerald green, fresh growth for the season ahead.

It’s hard to imagine that this time three years ago in 2013, there was still thick snow on the ground – in places several feet deep – that would last for a week or more.

March 23rd – The towpath resurfacing between Walsall town centre and Bentley Mill Way continues, as I noted earlier in the week, tarmac is being laid on top of compacted ballast. It’s a nice enough surface, but I’m still bemused by the pointlessness of it all.

Today I passed as they work crew were filling a butty with hot asphalt, ready to spread and roll. The ease with which it tipped from the excavator bucket and the steam that billowed suggested it was very hot indeed – and it made me wonder how it was heated – in the yard or from the place it was produced? I suppose the limestone grit it’s made from has quite a high specific heat capacity, so it must hold heat awhile.

One thing I always love about hot tarmac is the smell. It’s one of the really strong smells I recall for some reason from my childhood, and one sniff of it and I’ back in the schoolyard.

Funny how smells do that to you.

March 21 – The resurfacing of the canal towpath between Walsall town centre and Bentley Mill Way continues apace; I noted today that sections of the route have a newly-laid tarmac surface. It’s a nice job.

I still can’t get my head around this. I’m not ungrateful – I use this route regularly and it’ll be nice to ride – but this money would have been much better elsewhere on the local canal network – like the stretch from Longwood to Rushall Junction or from Goscote to Pelsall.

The Canal and River Trust are beyond my comprehension sometimes.

July 8th – An enervating, hectic day from which I returned late. Tired, aching and verging on a sugar crash, I relented and stopped for a rest and a few sweets at the small meadow above the new pond at Clayhanger. I’d caught it in a lovely golden hour, and I reflected on how this spot had changed. When I was a kid, this hollow leading to a sunken pond with tree-lined banks was a spoil heap standing a good ten feet above my head. Between then and now, the colliery spoil was removed, the area landscaped and allowed to mature.

Not all change is for the worst.

June 25th – People have been asking me why I haven’t featured any pictures of the new leisure centre development at Oak Park yet. There’s a simple answer to that – it’s very, very hard to get good images of.

The site is huge, surrounded by trees and high hoardings, and you can’t get a good angle on it. But it does look like it’ll be nice; looking through the trees today I could see they had been digging the pools out under the steel frame.

It’s also a remarkably well-run site, with flowers planted outside the gate, and even water for passing dogs.

I’m watching it carefully, and as soon as there’s a better photo-op I’ll go for it.

June 17th – This is joyous.On the banks of the new pond at Clayhanger, what I believe to be northern marsh orchids growing in profusion. The grass is not cut here, and there must be 40 or so of these beautiful purple flowers. They are doing well, and they’re just gorgeous.

The whole bank running down from the towpath is a carpet of wildflowers, and alive with bugs and bees.

There are usually a few marsh orchids on the towpath up towards Aldridge, but the Canal and River Trust’s ferocious and inflexible mowing schedule means that all the best specimens have this year been shredded to pulp in the name of tidiness.

Let’s hope the mowing zealots don’t spot these…

May 25th – I’ve found a little oasis I never realised existed, but more on my main blog later in the week. In the meantime, here’s a grey wagtail I watched for ages, fetching bugs and feeding it’s young in an outbuilding. At one stage, it was challenged by a robing for hunting rights.

An amazingly close experience I never thought I’d have.

May 13th – Less dramatic and more serene was the view over the new pond at Clayhanger from the canal towpath; caught in a glorious golden hour, the fresh greens glowed in the evening, and all seemed right in the world.

I was, of course, taxed for tidbits by the same pair of geese as usual, the canny devils – all hissing and wing flaps until they get food, then they waddle off, sated.