June 12th – Following isolation of the leak at Little Bloxwich, the canal level has continued to rise and is now about 20-25mm off maximum (ie. the weir bar at Clayhanger overflow), so more or less back to normal.
It took a while, with problems at Chasewater and with balancing pumps having to be installed at the leak site, but thankfully, apart from the fact that there’s a large repair required in Little Bloxwhich which will prevent passage from Brownhills to Wolverhampton and vice versa by boat for a bit, it’s good to see the waterway back to normal health.
This could have been so much worse.

