July 11th – If you fancy a free, breathtaking aerial entertainment display, get your backside down to the Tame Valley Canal, and just look up.

High tension lines run along the canal from a control compound at Ocker Hill to another at Ray Hall, and this interlink is currently undergoing service. Huge scaffold towers and nets span roads, canals and railways, to support lowered lines; engineers scramble and dangle high above from the steel lattice-work, oblivious to the toe-curling peril they appear to be in.

They work quickly and with precision amongst a baffling array of hawsers, catenaries, safety lines and fall arresters, materials and tools being hoisted ip in a sack via a block and tackle hoist. 

And below? I watch, open mouthed at these confident, sure-footed and highly skilled engineers. Whatever they’re paid, it can’t possibly be enough.