June 15th – I’ve still yet to catch the linesmen in action, but work to install the new overhead lines over Mill Green continues apace. I’m not clear here if the cables in this shot are being pulled through to the ground drum or the other way around. Up near the pylon hanger, there seems to be the remnants of something attached to the lines, which is possibly the scars of a pair of Stockbridge dampers, so I think these are old lines being wound to the ground. This work continues to captivate me.
Leave a Reply