July 18th – Again, I made my escape, and I slipped into Birmingham mid-afternoon and got the train to Kings Norton, intending to ride into Birmingham University where I had a call to make, and then on to the city centre along the canal, which is great from King’s Norton all the way into the city.
It is when it’s open, that is…
It turns out the towpath is shut until September between Bourneville and University, for resurfacing. I slipped through the barriers easily at Bourneville, and rode a peaceful and generally rideable route all the way to the barriers at the other end, which were impossible to transgress, so I doubled back and found a way over wasteland down to the Aston Webb Road.
Hot and bothered, I made the visit I intended to, and rode into Brum on the canal, which was lovely.
It was again a great afternoon – but very, very hot indeed.
Just one thing spoiled it – I have a foot injury, or so it would seem. I don’t know what I’ve done, but my foot is agony to walk on; not bad to cycle on, but it makes it more difficult. This is unusual for me, and I hope it heals soon.
Rather than ride home from Birmingham, I caught the train.





