#365daysofbiking Surface tension

February 20th – As I headed home to Brownhills on the canal, my attention was snagged by the noise from the Lindon Road, and then I remembered that it was being resurfaced overnight.

With my love of machinery, I couldn’t resist taking a look.

The dust, noise and spectacle were fascinating, and I love how the road surface is recycled into new tarmac.

The operation is a well-practiced, highly co-ordinated ballet of trucks, machines and people each with their own task.

A captivating sight.

This journal is moving home. Please find out more by clicking here.

from Tumblr https://ift.tt/2Sed8Rb
via IFTTT

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.