#365daysofbiking Surface tension
February 20th – As I headed home to Brownhills on the canal, my attention was snagged by the noise from the Lindon Road, and then I remembered that it was being resurfaced overnight.
With my love of machinery, I couldn’t resist taking a look.
The dust, noise and spectacle were fascinating, and I love how the road surface is recycled into new tarmac.
The operation is a well-practiced, highly co-ordinated ballet of trucks, machines and people each with their own task.
A captivating sight.
This journal is moving home. Please find out more by clicking here.
from Tumblr https://ift.tt/2Sed8Rb
via IFTTT
Leave a Reply