#365daysofbiking Stark, bollock naked

October 28th – Telford’s new footbridge linking town and railway station – built to replace an older one rendered unsuitable for wheelchair users – is still plagued with standing water, despite attempts to alleviate it by drilling holes in the bridge deck.

In a total admission of design failure, large diameter holes have now been cut into the floor with grilles like plughole in them. I guess this has to work, if they’re in the right place.

Sadly there is no guttering or drain on the whole structure, and to put it bluntly the drained water will piss onto the commuters standing on the platform below.

Quite how a council and railway management company can allow a huge structure – getting on for 10 million pounds worth – to be built and commissioned with no rainwater control whatsoever is utterly beyond me.

Recently there were posters around the station begging passengers to vote for this ill thought out, awful bodge in some or other architecture competition.

A lot of Telford seems quite fond of this dysfunctional mess.

Telford, your emperor is stark bollock naked.

This journal is moving home. Find out more by clicking here.

from Tumblr https://ift.tt/2q7PM7u
via IFTTT

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.