#365daysofbiking Going with the flow:

Sunday March 14th 2021 – An errand over to Burntwood meant crossing Chasewater dam for a second day running. I note that the water level in the Nine-Foot pool is still high and overflowing into the spillway.

With the lack of boat traffic on the canals due to lockdown, there has not been the demand for water in the canals, and Chasewater has filled and been in overflow for most of the last twelve months. Over winter particularly, through very wet weather, releasing water into the canal to flood the upper Tame overflows would be problematic, so the excess has been steadily feeding the alternative path via the spillway to the Crane Brook, to some local consternation.

An odd effect of the pandemic, it’s worth remembering that when water is released in large volumes it doesn’t just affect us locally, but all the way down the drainage system.

from Tumblr https://ift.tt/2OX6fIk
via IFTTT

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.