#365daysofbiking Surface tension

February 20th – As I headed home to Brownhills on the canal, my attention was snagged by the noise from the Lindon Road, and then I remembered that it was being resurfaced overnight.

With my love of machinery, I couldn’t resist taking a look.

The dust, noise and spectacle were fascinating, and I love how the road surface is recycled into new tarmac.

The operation is a well-practiced, highly co-ordinated ballet of trucks, machines and people each with their own task.

A captivating sight.

This journal is moving home. Please find out more by clicking here.

from Tumblr https://ift.tt/2Sed8Rb
via IFTTT