July 24th – I’ve waited a long time to catch these technicians in action, and finally, on my homeward commute from Blake Street today, I spotted them.

These are very long range photos of a pair of engineers working on the dismantling of the temporary changeover TV transmission mast at Sutton; it’s about a mile away from where I stood.

Nonchalantly, they work inside the latticework, hundreds of feet above Sutton. Their lift cradle is called to an intermediate platform, they climb in, and are lifted to a higher part of the mast to carry on with the job. As they’re lifted, one of the duo casually checks his mobile.

I don’t know what these people are paid, but they’re clearly worth every penny, and seem quite, quite fearless. Respect to them.

July 10th – Slowly, but surely, the temporary mast at Sutton Coldfield is being dismantled. I explained a month ago how a crane was fixed to the upper stages, and the structure was dropped carefully, piece by piece. 

Today I noticed the DAB antenna were in the process of being stripped. These are the spiky structures clustered around the main mast in one spot, for about a 6th of the total height. If you look carefully at the bottom picture, you can see where cables, once connected to the elements are now hanging free.

It was a dull, overcast day, and I was hoping to catch a team at work up there, but have still yet to see one. 

This is remarkable, painstaking work by very, very uniquely skilled people.