July 10th – Slowly, but surely, the temporary mast at Sutton Coldfield is being dismantled. I explained a month ago how a crane was fixed to the upper stages, and the structure was dropped carefully, piece by piece. 

Today I noticed the DAB antenna were in the process of being stripped. These are the spiky structures clustered around the main mast in one spot, for about a 6th of the total height. If you look carefully at the bottom picture, you can see where cables, once connected to the elements are now hanging free.

It was a dull, overcast day, and I was hoping to catch a team at work up there, but have still yet to see one. 

This is remarkable, painstaking work by very, very uniquely skilled people.

September 11th – For the hell of it, today I got off the train at Four Oaks and rode back from there. On my way back through a sunny Little Aston, I noted the TV transmitters at Hill Hook. Having recently converted to digital, there are currently two masts – the taller one was first, then the one on the right was erected to substitute for it when the original was upgraded for digital. Now the switchover has taken place, I’m looking for signs of the temporary mast coming down, but nothing yet. 

I love these structures. So elegant, so beautifully engineered. Visible for miles around.