June 25th – Over in Telford on Monday morning, sun streamed down on construction workers and engineers preparing for the following week when a huge crane will lift the first, over-railway section of the new bridge into place from where it’s being assembled right next to the westbound platform.

Last week I couldn’t work out how they were going to lift it into place with nothing to put it on – then today I realised that as well as the deck, the piers had been assembled out of their final position too – the two lattice and glass pillar towers beyond the green crane will be bolted onto the matching concrete bases each side of the railway, and the new deck bolted to it, spanning the tracks.

What I can’t work out is why they’ve fitted the glazing before they finally lift the towers – surely moving them will fleet the structure so much the glass will break?

Perhaps it’s tougher than I think… we shall see, I guess…