July 11th – I returned via the Trent Valley Canal, which was alive with activity. Linesmen performed feats of acrobatics on the electricity lines above me as I drank tea beneath them, watching in awe. Herons were prolific, and I saw at least 7 – yes, there are three there in just one photo. The local cat population was also languidly active, hunting bugs, birds and furry things in the newly mown opposite embankment.

And beyond? The dull rumble of traffic on the motorway, trains, and of industry, breathing. This is a peaceful artery and a wonderful place.

June 15th – I’ve still yet to catch the linesmen in action, but work to install the new overhead lines over Mill Green continues apace. I’m not clear here if the cables in this shot are being pulled through to the ground drum or the other way around. Up near the pylon hanger, there seems to be the remnants of something attached to the lines, which is possibly the scars of a pair of Stockbridge dampers, so I think these are old lines being wound to the ground. This work continues to captivate me.