March 26th – In Telford for a meeting, the footbridge project continues it’s bizarre stop-start behaviour, baffling to the uninitiated. Piles are bored and concreted now, sheet piling has appeared along the roadside, and a cavity there had been dug – maybe for a pier or lift-well. Steelwork has been driven into the earth and cut to varying lengths, and there a lot of noise and action. But no visible chap yet, and nothing on the Euston Way side of the station at all.
I guess this is one of those puzzling projects that will just sudsy come together, but it’s very intriguing to watch.





















