March 8th – At Telford, the piling for the footbridge project near the station is progressing apace, and the machinery in use is fascinating. 

Holes are being bored, reinforcing assemblies being placed within and concrete pumped in. The depth of the bores is extraordinary, and an army of workers in orange wait for their moment to undertake their assigned tasks.

This is a hugely complex project which has surprised me – I can now see why it’s costing so much.

January 30th – Visiting Telford in the morning, the work on the new footbridge there is very serious now. A large continuous flight auger piling rig is drilling very deep piles to support the new structure, and concrete trucks line up to supply it as it works.

In front of the rig, the first pile is standing clear of the ground bounded by the blue sleeve, and on these solid foundations, the new bridge will stand.

Earth is being moved, surveyors measure the ground and excavators are busy. This is a project well underway know and will be worth keeping an eye on.

August 22nd – I had to pop to Telford mid day, and leaving the station for the cycleway I looked back and noticed something in the sea of built environment – the tip of a yellow drilling rig near the westbound railway platform.

I noticed a few weeks ago there was an application to build a replacement bridge here – the current one is decaying, and not compliant with disability legislation (the slopes would be very unpleasant in a hand-propelled wheelchair, it’s clear to see). The proposal is in, and it looks like the engineers are doing ground investigations in readiness of anticipated approval.

I never noticed the rig as I rolled past, and it’s position was very secluded – but looking over, it’s quite large. 

Hiding in plain sight.

October 13th – Passing through Kings Hill, Darlaston today I noted activity on the site of the old Servis washing machine factory. This site – derelict for years, and once posited as the site of a new retail and leisure park by a prominent, diminutive Walsall Councillor – last year had a new housing estate approved for it. Like the Exidoor factory nearby, industry is being replaced in this area by houses.

I’m sure they’ll be nice, but it’s hard not to lament the loss of jobs and occupation.

Still, the drilling rigs are on site, and a surveyor has clearly been very thorough in marking out the subterranean hazards that lie beneath, judging by the spray-paint hieroglyphics all over the paths and road nearby.

June 26th – Without my trusty camera, the phone was employed again on the way home – but I hate it, and inadvertently set it to take square images, which are no use to man nor beast.

I took some photos of a lovely black and white puss that walked out of the hedge in Green Lane, and mewed a greeting at me, but the images were terrible. Just as well that I noticed this impressive pile drilling machine on the building site near Catshill Juntion. It will be drilling foundation piles for the new maisonettes here.

That’s a large drill bit and an impressively complex piece of equipment. Bet it would be fun to play with…