#365daysofbiking Disasterous design

January 17th – It’s rare I’m negative about anything over much, but the new footbridge at Telford Station is an utter design failure and in my opinion, a fiasco.

Still very much unfinished, the build quality in places is very poor, the finish terrible and when I arrived mid morning, both lifts had failed.

With no lift on the westbound side, and the utter design failure of no ramp, I had to shoulder my bike and carry it up the steep steps.

The old bridge had no lifts – but ramps both sides. Although not good in a wheelchair, they at least were continuously available. If the westbound lift fails here now, wheelchair uses are stranded.

The situation is so bad there is now a hastily drawn up plan for calling for help if  the lift fails.

The powers that be have spent 10 million pounds to make the situation far, far worse for wheelchair users than it was before they started, ostensibly to improve things for them.

Telford and Wrekin Council and Network Rail should hang their heads in shame.

This journal is moving home. Please find out more by clicking here.

from Tumblr http://bit.ly/2MmFxTJ
via IFTTT

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.