April 25th – The weather is still quite intemperate, but improving. Temperatures climbed at the weekend, then sank again, but on the whole it’s been a drier week – but windier – although the sun too has been welcome.

This improvement has meant trees are now well into the greening phase and it’s starting to look like summer is coming.

With blue skies and emerald embankments and hedgerows, the canal is looking gorgeous again.

It’s a pleasure to see.

April 20th – And so, spring is on her throne at last and summer is booting up.

The speed at which this has happened this year – in no more that a week – has been startling and rather wonderful.

Every day new discoveries, and whilst yesterday, the blossom was just starting, this morning it was showing strongly.

How long I have waited for the light, the warmth and the wonderful burst of life. It was worth the wait.

April 8th – I’ve been trying to get a decent version of this photo for ages. For two winters, in fact. What usually spoils it is traffic on the bridge and ripples on the surface of the canal. At Anchor Bridge tonight though, there were little of either when I flowed along here liquid back into Brownhills High Street – the reflection of the canal wasn’t bad and the Anchor’s lights looked welcoming and warm in the dark.

Sometimes, with some photos, its just a matter of patience.

April 7th – Ogley Junction Footbridge is mystifying me a little. The bridge itself and deck were restored beautifully, to much local praise. The remainder of the work – the spit and polish, if you like, hats been patchy. 

The pathway off the bridge was originally remade badly, and now has been dug out and corrected, which is good to see. But the bit baffling me is the masonry.

The brickwork on the wing walls has been vary sparingly pointed, here and there. To me, it looks like it all could have done with doing, and bits still seem to be in a parlous state. I’m prepared to accept the work might be ongoing and not finished yet, but if it is a work in progress, there’s no logical pattern to completion whatsoever.

A bit of a conundrum.

April 4th – I’d had to call into Aldridge after working late and returned via Streets Corner. I noted that the old wall to the 60s shopping precinct on the corner had gone, and excavations were underway.

This is the preparatory work for the next stage of local junction improvements work which will see this entire junction remodelled with new signals, slip roads and crossings.

Peaceful now in the gathering dusk, but a summer of inconvenience and holdups for motorists seems to be on the cards…

Shire Oak has been massively improved, however, so it’ll be worth it in the end.

March 24th – One thing I am liking very much at the moment is the improvement works to the Shire Oak Junctions. At 8pm on a Saturday it was of course quiet, and the asphalt glistened in the light in the damp of a short, passed shower. But the new surface, more intelligent light operation and better lane markings have made a real difference, and queues along the A461 – particularly at peak times are significantly reduced.

When Streets Corner is also complete, I expect the difference will be really noticeable. 

Well done to all concerned.

March 16th – I had to nip up to Burntwood after an early return from work, and I took a muddy, wet canal towpath up to Chasewater.

My favourite tree at Home Farm, Sandhills seems to be getting into a spring jacket ever so slightly, and the greens were just a bit brighter than a week ago.

Ogley Junction bridge is now finished, and it looks great. The metalwork and bridge deck have been superbly refurbished, but it’s sad the brickwork didn’t get any love. Maybe that’ll be a separate job. 

At Chasewater, I was surprised to see the reservoir overflowing. It’s normally allowed to fill and overflow at this time of year, but the valves are still closed and the spillway is flowing with water. In light of the dispute ongoing between Staffordshire County Council, the owners of Chasewater and the Canal and River Trust who use the water it contains, it’ll be interesting to see how long the lake continues to overflow.

March 11th – A ride out to a farmer’s market then on tho Middleton Hall for cake, and back via Hints and the A5. The day wasn’t the best of weathers, but is was pretty good, and I didn’t get rained on until very late in the ride.

I noticed the animals on this ride particularly: the first spring lambs up at Barracks Lane; the goose at Middleton Hall. But what stole it were the cats: the lovely chap drinking from the canal at Catshill Junction; the weary, wary looking farm cat at Raikes Lane; the black tiny one in Fazeley.

Spring must be coming, the cats are starting to emerge.

March 1st – I took the chance to check out the Ogley Bridge renovation work, as I feel sure it must be close to reopening soon. As I suspected, if you approach the works from the Chasewater side it’s possible not only to enter the work canopy, but leave from the far end, with less hauling of the bike – just a bit of a throw and clamber around some sectional fence. 

The scaffold cross-members that originally blocked the bridge deck have gone.

I note that the painting now seems to be over and that the deck has been surfaced with a nicely grippy texture, so as I suspected, reopening cannot be far off now, which will reopen the route for less adventurous cyclists and walkers.

This renovation has been much more thorough than I anticipated.

February 24th – An abortive ride out to Lichfield from which I planned to arc back around to Chasewater and catch the sunset, which looked like it would be a cracker. I got as far as Ogley Junction Footbridge and discovered the camera battery was flat. 

I was very annoyed, but investigated the bridge restoration, and was pleased to note that they’ve replaced the bolt whose absence was irritating me. And the replacement looks authentic, too.

Nice work. Terrible phone photo.