February 16th – Chasewater: the suspense is killing me. Last week, 33cm from full. Thanks to a week of snow and heavy rains, now 14cm from full. A gain of 19cm – nearly 8 inches since last Sunday evening. Considering the huge surface are of the reservoir, that’s astounding.

I noted these teenagers running along the top of the weir, trying to demonstrate their bravado to their female companions. Nothing changes. When I was their age, I’d have been doing the same thing. Bet at least one of them ended up squelching home, dejected.

January 26 – I’d prayed to Thor, the god of meltwalter, but not much happened. We had heavy rain, then it refroze; but skipping out mid day for a sandwich and a brew, there was a sharp ramp-up in temperature, and the thaw set in with some urgency. It actually felt tropical.

I had to admire the British stoicism of the picnickers with flask and camera. They didn’t even have a dog.

Even the sailing club got their boats out.

The riding was terribly poor; the ice on the paths around Chasewater was unridable as it was too mobile; it was like riding on pea gravel.

The bird life is booming at Chasewater; we recently had the largest gull roost in many years, with upwards of 10,000 birds, and the waterfowl on the boating lake are as persistent as ever. I love the domestic white geese and the way they hector me for food.

The water level continues it’s inexorable rise; on January 11th, the water was at 75com from the top of the scale, it’s now 64cm, a rise of 11cm or just over 4 inches. With the huge increase in lake surface area, that’s a immense amount of water.

The 9-foot pool has now joined the main lake through the new bridge, and it won’t be long until the water overtops the weir into the spillway – that is, if it’s allowed to.

It’ll be interesting to see the effects of the thaw.

January 13th – It was cold, winter at last. I could smell snow in the air as I left home on a day that was so chilly, it caused my sinuses to and forehead to burn. I pottered up to Chasewater, delighting in riding over the icy puddles, and then over to Hammerwich, which is always nice at dusk. On the way up Meerash Lane, I pulled up short; the ice here – caused by water raining from the still-saturated fields, was thick and treacherous. Staffordshire Council never seem to grit up here, and I advise anyone without ice tyres not to bother. Under a fresh coat of snow, this could be an unpleasant start to the week in the morning for someone…

December 16th – I went back to Chasewater in the daylight to investigate how the water levels were behaving, and to seed what was going on with the balancing culverts between the main lake, Nine-Foot pool and the spillway. It seems the sluice that was open from the Nine Foot to the spillway has now been closed, and looking at the output side it seeks very well indeed. Water should now continue to rise until it reaches the top of the breakwater on the left. This means there’s about a metre to a metre and a half to go before the lake is full.

Last time I checked the level, it stood at 6cm from the top of the lower metre scale on the pier. That was on November 25th. Today, on December 16th – a mere 21 days later – it stood at just shy of 58cm on the upper metre scale. That’s an increase of 48cm or about 19 inches in 21 days. This is astonishing, and is largely due to the heavy rains on already saturated grounds, causing runoff to fill the reservoir. I don’t think anybody ever thought such a rate of fill was remotely possible.

I noticed while I was mooching around the Nine Foot that the red deer had been and had a look before me…

October 19th – Working from home today, I spun out late afternoon on errands and to get some shopping. It was misty and grey, but all the same, I headed to Chasewater to check out the levels. It was pretty deserted at 5pm, and the boating lake was a peaceful soup of wildfowl, who flocked around me hoping I had food. The sheer variety in the duck population – domestic, blended with mallard, crossed with tufted ad infinitum – was fascinating. Ducks will mate with just about anything they can, and the diversity here is illuminating. 

I see the domestic white geese are still terrorising visitors, too, the aggressive devils. Goose bills are the stuff of nightmares, eh? Look at all those serrations…

September 29th – It’s finally happened. We’ve had so much rain in recent months, the Chasewater has refilled to an unthought of degree. Now, the water level is registering on the scale on the pier; just 20 days ago it was well below it. The scale starts at 148.35m AOD, having risen from it’s low point of 143.7m AOD last September. A huge gain, nobody thought this was really possible. 

Mind you, the price of this restoration has been a bloody awful summer…

August 27th – Still, there’s always nature to surprise you. This carpet of fringed water lilies has suddenly materialised near the canal aqueduct at Newtown, Brownhills. I’ve not seen this type of lily growing here before, and wonder if it’s a domestic escapee. Whatever the provenance, these flowers were delightful even in the rain, and they did lift my grim mood.

July 22nd – Chasewater is returning to normal. A hot summer Sunday at last, and the place was packed. People cycled, strolled, played games with the kids or just took the air. Boats were sailing, even a rowing boat scudded over the water. Levels continue to rise. It’s like watching a dear old friend recover from a debilitating illness. Wonderful.

July 7th – One standing water issue I know it’s unreasonable to expect anyone to ever solve is Green Lane, at Jockey Meadows between Walsall Wood and Shelfied. It has always flooded here; it’s the lowest point on the road between the two places, and sits in the marshy wetlands that drain Shelfield, High Heath, Pelsall and Brownhills. I think there’s little that can be done in civil engineering terms to solve this, that wouldn’t involve pumps and huge expense. There’s nothing to do but pick your moment, and plough through it. It’s not like a rural flood, though, so take care. The sewage works is nearby, and when overwhelmed, it will discharge to the Ford Brook. There’s a very real chance of contamination in that water. Close your mouth and go slowly…

June 9th – Chasewater is rising. In all the rain, the only benefit is that the waterline is slowly, almost imperceptibly enlarging. A landmark occurred this week; the ‘pier pool’ left stranded from the main lake, has rejoined it once more. Curious spits and islands have developed. You can see the ecology shifting day by day. But don’t be fooled. The next meter in depth will increase the surface area of the reservoir hugely, and take a massive amount of water. That, sadly, means a very, very wet summer. A terrible dilemma…