March  7th – I had to nip to Telford, and as I came through the station I noted that the tree clearance now seems to have ended, and construction weens to have started in earnest on the western side of the bridge span.

I was also pleased to note that the daffodils on the station ramp side that bolted wonderfully when cleared of their shady tree-cover are coming into bloom as yet untroubled by the construction machines. it’s right they should bloom unfettered for a final time, I think.

This project has caught my attention and I’ll be interested to watch it progress – not least to see how they manage to built a new access way that will so clearly interfere with the old one, and yet still maintain public access.

February 15th – I see the completion of the conversion of the old church/chapel at Kings Hill, Darlaston is very nearly finished: this has taken years and the workmanship looks stunning.

I’ve been passing this former Methodist chapel and church for a very long time, and it’s previous dereliction caused me sadness – but now it has been made into dwellings, and unlike the usual architectural cut and shut that’s the norm in these cases, the renovation has been astoundingly detailed. 

Stained glass has been repaired, missing lead on the roofs, gables and mansards has been replaced. Stonework and architectural ironwork has been repaired, restored or remade. It’s a work of art.

I don’t know who’s been responsible for this, but they deserve some kind of award, and certainly a lot more attention.

It just goes to show what can be done with old buildings given enough attention, time, money and flexibility in the planning system.

My compliments to all concerned – particularly to the chippy who made those wonderful doors!

April 21st – I came back through Walsall Wood as I had to make a call, and noted that the new leisure centre at Oak Park was nearing completion. Due to the size and location, it’s been really hard to get decent pictures of, but it looks like it’s going to be a great place and a worthy successor to the raging centre currently here.

I note huge amounts of earth are being moved around the site at the moment to regrade an re-landscape it.

I look forward to seeing the finished project.

February 24th – Darlaston is changing right now. In its parks – Victoria and Kings Hill – spring his here, and the first signs of a green summer are just seeping into the landscape. Daffodils, crocuses, primroses and snowdrops dapple the lawns and beds, and everything seems just a shade more alive.

I actually saw a honeybee today. It’s not yet March.

In the parks though, the peace is uneasy; a susurration of labouring diesel engines, the whine of hydraulics and the rupturing of concrete as nearby, the land the old Servis factory stood on is reclaimed for new housing. So much concrete on site to be pulverised, an army of fascinating machinery is working away at it.

Change is good. Chase is interesting. But the change for the greener lifts me the most.

January 19th – In Darlaston’s Kings Hill, the former Servis domestic appliance factory site is soon to be transformed into housing. Once employing thousands, this ground was cleared after the company went bankrupt and lofty promises of new retail and leisure developments were made. But permission was granted for houses, which in fairness, we do need. 

A few months ago, surveyors marks appeared on the nearby pavements and roads; then ground inspection bores were made. Now the heavy plant and high vis are arriving, ready to move rubble and earth and create a new neighbourhood.

Soon, you’ll never know Servis were ever here.

December 9th – A better day today, for sure. For starters, it was dry, sunny and cooler – it felt like a real winter was coming. We’re getting really close now to the winter solstice and the start of the opening out – yet we’ve barely had a true frosty morning. This year has been odd.

I was further cheered to note that at James Bridge, on the Walsall/Darlaston border, the hard work by planning enforcement officers and the Environment Agency has led to the clearing of the mess here on the field next to the River Tame. It had been in use as a store for general building materials and assorted debris, apparently without planning approval. The whole site looked a mess and seemed to be little more that a glorified fly-tip. 

The site isn’t completely clear yet, although it’s much, much improved. It’s good to see action to remove the blight and a possible source of pollution to the recovering river.

Nice work. Thank you.

November 3rd – intrigued to note that the Kings Hill Methodist Church in Darlaston is still undergoing extensive work to convert it to flats 12 months after the conversion started. This is clearly no cheap, quick fix – the work has involved relining the roof, with all the tiles removed and replaced, skylights added, and I was pleased to note today all the lead stolen from the front gables had been carefully replaced.

It’s been fascinating to watch this transformation and I’m keen to see the results. What I thought would surely be some bodge has turned out to be respectful, skilled and so far, very sensitive to the original building.

Meanwhile, the metal poppies in the railings of the adjacent park are a wonderful touch, especially at this time of year.

July 30th – Passing through leafy, upmarket Mill Green on the way to work, I noted that the large abandoned house on the corner of Forge Lane looks to have reached the end of the line. Abandoned for years, I never found out how a very large, modern family home on the outskirts of Little Aston comes to fall derelict, and I now doubt I ever will, but the property was for sale for ages and was finally procured by developers a year ago.

Since then the surrounding scrub has been cleared, and a small bungalow built in the back garden. In the last couple of days, a large excavator has appeared which I suspect may demolish the house.

It’s nice to see something being developed on such an abandoned site, but one does wonder what happened.

A mystery.

May 26th – Around the corner, the new housing development at Streets Corner is looking very nice. Replacing homes that had been derelict for a decade or more, this new build project has been a long time coming, but I like this modern townhouses a lot. I like the materials used, and the pleasant, traditional approach.

So much better than what was here before, and much more aesthetically pleasing than I expected.