#365daysofbiking Station to station

October 16th –  I didn’t use Bloxwich station for years, as the Chase Line trains that shuttle this line between Birmingham and Rugeley tended to be horrendously crowded into city, and a similar nightmare in the evenings, but since the line has been electrified with longer trains, it’s been a lot more convenient.

The station itself is little more than a suburban halt, but welcoming enough and I love the lighting at night. Where it does win for me is it’s a nicer ride home than Walsall, Blake Street or Shenstone, and about the same distance.

The train times don’t often work for me and this service, so I’m unlikely to be a regular user but I’m growing to like it. The Chase Line upgrade has been good for me and once the service wrinkles are ironed out it could be very useful indeed.

This journal is moving home. Find out more by clicking here.

from Tumblr https://ift.tt/35YD1MS
via IFTTT

#365daysofbiking Strange signals

September 19th – Returning to Bloxwich station, I alighted at the north end of the platform. Since the electrification of the Chase Line, I’ve been wondering about some aspects of the installation.

I note the metalwork of the light column near this signal control cabinet and the guard rail behind has been heavily insulated and screened. I’ve not seen that before. Wonder what’s in the cabinet that’s so dangerous?

The other columns are not insulated in the same way. Puzzling.

This journal is moving home. Find out more by clicking here.

from Tumblr https://ift.tt/2me6WP9
via IFTTT

#365daysofbiking I dream of wires:

September 10th – Two things I thought I’d never see in my lifetime are the Chase Line Electrification and the creation of the pedestrian bridge to cross the tracks at Moors Gorse instead of the level crossing, but here I am, taking pictures of one from the other.

Interesting to see how far advanced the electrification of this busy passenger railway from Walsall to Rugeley now is – the catenaries are in, strainers all fitted and it seems here very close to functional.

I note the blue earth bonds to prevent the overheads going live while being worked on, and the curious block communing point on the track not yet connected to anything, but with the coil of bonding cable nearby ready. Wonder what that’s actually for? It looks like there’s some kind of sensor built into it.

Never seen those before and I’m curious.

January 18th – After months of being shut to be rebuilt, the North Street Railway bridge, linking The Butts with Birchills in Walsall is very, very close to reopening. Rebuilt higher to accommodate electrification of the railway beneath, the bridge seems much steeper than before. 

Still, it was fun to ride up and down while traffic free and still closed – and at the top, a decent view of the New College at night.